The swimming pool and hot tub / spa were completely refinished with new tile and pool lining. The project was started and finished in January.
The pool filter was replaced.
The hallways were recently painted on all floors
The Owner club room will have a basic redo, painting, and new artwork to be installed. This will give the club room and hallways a more modern look.
The Fascia and stucco will be fixed, as well as all dryer vents to be cleaned from both inside and outside the building, using a man-lift. Screen coverings should also be repaired.
Special Order parts for the elevators were ordered and installed.
The state of Florida is requiring a special emergency communication system be installed so that emergency personnel on scene can use their own emergency communication systems.
Additional security camera will be installed around the property to give management and owners a more complete view of what is happening. Camera should be the enhanced optics type cameras..
Copyright © 2022 Opus Condominiums HOA Daytona Beach Shores - All Rights Reserved.
Powered by GoDaddy